News

October 4, 2018

Work site on Rivière des Milles-Iles bridge between Oct.15 to Nov. 30, 2018

NOTICE TO RESIDENTS: The MetropolitanEXO Transit Agency announces that construction will be taking place on the structure of the bridge over the Rivière des Milles-Iles. The work will be carried out day and night during the weekends between October 15 and November 30, 2018. The schedule of work during the weekends only is from Friday 23:59 to Sunday 23:59. The EXO agency will distribute Notices to residents in the work area as well as residents in next to the railway structure.

Residents who will be affected by the work site are located:

– On the boulevard du Lac: from chemin du Grand-Moulin to 13th avenue,

– On chemin du Grand-Moulin: from the boulevard, to the river,

– From 8th Avenue to 13th Avenue: from Lake Boulevard to the river.

For details on the railway’s work on the Rivière des Miles-Iles Bridge, click on this link:   Avis_riverains-IleBoisee-horaire modif 14 sept-2018

For all information relating to the schedules of train, bus and other transit services put in place during the work visit thehttps://exo.quebec/ EXO

by phone at 514-287-8726

toll-free at 1-888-702-8726

Monday to Friday from 9 am to 8:30 pm

and Saturday, Sunday and holidays from 9 am to 5 pm

To consult the directory for the users of EXO click on this link:

Phone lines directory dedicated to the users of the EXO agency and public transit services